Pierce-Burch Water Treatment Plant – Arlington, Texas
Client: City of Arlington
Location: Pierce-Burch Water Treatment Plant
Pipe Size & Length: 54-inch concrete pipe, 420 ft
Project Duration: Completed in 8 days (scheduled for 14 days)
Point of Contact: Cijo Jose, Water Treatment Plant Manager
The City of Arlington required structural rehabilitation of a deteriorated water transmission pipe showing signs of concrete scouring and leaking joints. The project restored the pipe’s structural integrity and ensured reliable stormwater conveyance to the facility’s underground reservoirs.
Surface Preparation
Coating & Structural System
1. Primers
2. Structural Rehabilitation
3. Protective Topcoat
OBIC 1100PW applied after foam became tack-free, providing long-term corrosion and infiltration protection
All crew members completed required safety training through Walsh Group prior to site mobilization, ensuring safe and compliant operations within confined spaces.